Fire Alarm Replacement and Fire Suppression Repair Project

“To provide the inmates and staff at Mule Creek State Prison a safer environment in which to work and serve.”

Period of Performance: February 2023 (ongoing)

Scope: GCC was contracted by Herman Construction to deliver facilitated Partnering for the Fire Alarm Replacement and Fire Suppression Repair project at Mule Creek State Prison, Ione, CA.

Major stakeholders: Include California Department of Corrections and Rehabilitation (CDCR), Vanir, Arrington Watkins Architects, and Herman Construction.

Project Description: The Mule Creek State Prison Fire Alarm Replacement and Fire Suppression Repair Project scope includes replacement of the fire alarm control panels, network connections, detection device replacement, along with various fire and life safety repair items that were identified in comprehensive studies of the fire alarm systems. The result of this project will be a comprehensive system for the entire facility.

Project Gallery

Central Substation #2 at JFK Airport

“CS2-Powering A Whole New JFK” Period of Performance: February 2023 (Ongoing) Scope: GCC was contracted Yonkers Contracting Company to deliver facilitated Partnering for the Central

James A Musick Facility Phase I

“Creating a safe and secure environment while inspiring change through health and wellness.” Period of Performance: February 2021 (Ongoing) Scope: GCC was contracted by Vaniron

El Paso VA Health Care Center

“Work as a collaborative team to deliver a healthcare center that honors America’s Veterans with timely exceptional healthcare contributing to their health and well-being.” Period