“Deliver the first B-21 Military Construction project as the cornerstone for Strategic Deterrence and Combat Air Power at Ellsworth AFB”
Period of Performance: February 2022
Scope: GCC was contracted by Walsh Construction to deliver facilitated Partnering for the new Ellsworth Air Force Base Low Observable Restoration Facility (LORF) at Ellsworth AFB, Rapid City SD.
Major stakeholders: Included US Army Corps of Engineers Omaha District, Air Force 28th Bomb Wing, Air Force Civil Engineer Center, Air Force Global Strike Command, Burns & McDonnell, and Walsh Construction.
Project Description: The Ellsworth Air Force Base B-21 Radio Frequency Hangar project constructs a 120,000 SF high bay special maintenance hangar with two segregated aircraft positions in support of the new B-21 weapons system to repair and restore low observation characteristics. The scope also includes the demolition of an existing hangar and surrounding structures.