New US Embassy Compound

“Create an iconic, secure, resilient environment for advancing US relations with Viet Nam.”

Period of Performance: June 2022 (Ongoing)

Scope: GCC was contracted by MBP on behalf of the Department of State, Overseas Buildings Operations (OBO) to deliver facilitated Partnering for the new US Embassy Compound in Hanoi, Vietnam.

Major stakeholders: Included Department of State, Overseas Buildings Operations (OBO), BL Harbert International, Page, and MBP.

Project Description: The Hanoi New Embassy Compound (NEC) is located on an 8.1-acre site adjacent to the Cau Giay Park, approximately six kilometers from Hanoi’s Central Business District. The architectural design involves a gradient concept representing the dynamism, ingenuity, and luminosity of the American diplomatic mission through the application of stainless steel, regional basalt, and glass elements. The campus to be constructed is equal to approximately 37,000 GSM. The project will be pursuing LEED Silver certification and involves implementation of a Conditions of Construction Agreement (COCA) with the host government.

Project Gallery

Central Substation #2 at JFK Airport

“CS2-Powering A Whole New JFK” Period of Performance: February 2023 (Ongoing) Scope: GCC was contracted Yonkers Contracting Company to deliver facilitated Partnering for the Central

James A Musick Facility Phase I

“Creating a safe and secure environment while inspiring change through health and wellness.” Period of Performance: February 2021 (Ongoing) Scope: GCC was contracted by Vaniron

El Paso VA Health Care Center

“Work as a collaborative team to deliver a healthcare center that honors America’s Veterans with timely exceptional healthcare contributing to their health and well-being.” Period